Power Backup For Telecom Tower

Off-Grid Solar System
October 7, 2020
Solar Street Light System
October 8, 2020

(1)Project Location: Nagama Taung (CDMA 450)

(2)Project Location: 44 Miles (Ygn-NPT Highway)

(3)Project Location: 49 Miles (Ygn-NPT Highway)

Purpose: Power Backup for Telecom Tower

Purpose: Power Backup for Telecom Tower

Purpose: Power Backup for Telecom Tower

No
Type of Solution

Capacity

DC Load

Using Material

1

Off-Gird Solar Solution

2400 kW

2400 W

Telecom Tower